The building is composed of three floors and 15 apartments: the ground floor where the parking spaces and the stores are located, the first floor and second floor with 7 apartments each, of 2-bedrooms and 3-bedrooms and the third floor consisting of a 4-bedroom penthouse.
Mechanical works
Water underfloor heating system with electric heat pump of high energy class for each apartment. Supply and Installation of air-conditioning units (split units or multi split units) on the bedrooms and concealed fan coils on the dining/living room. Mechanical ventilation for interior lavatories/bathroom.
Electrical works
Photovoltaic system on the roof for renewable source of energy.
To be delivered DECEMBER 2024